LOGO(1)

Project Cases

2000 NTU Floodwater Treatment: Prefabricated UF Plant in Zhong County | National Demonstration Project

National Demonstration Project: Our prefabricated UF plant with anti-fouling membranes conquers 2000 NTU floodwater in Chongqing, delivering stable <0.1 NTU water with 60% lower maintenance costs.

National Demonstration Project: Conquering 2000 NTU Yangtze River Floodwater with Advanced UF Technology

Project Overview: From Chronic Failure to National Benchmark

In Zhong County, Chongqing, a traditional water treatment plant repeatedly failed during Yangtze River flood seasons, causing over 15 annual shutdowns that affected 10,000 residents. Our prefabricated ultrafiltration solution not only solved this chronic problem but earned designation as a National Drinking Water Safety Demonstration Site – validating its breakthrough approach to extreme turbidity challenges.

2000-NTU-Floodwater-Treatment

The Critical Challenge: When Conventional Systems Fail

Extreme Environmental Conditions

🌊 Record-High Turbidity: Raw water turbidity spiked to 2000 NTU during flood seasons

⚡ Frequent Plant Failures: Traditional processes failed completely, causing 15+ annual shutdowns

🚰 Community Impact: Unreliable supply affected 10,000 residents continuously

Technical & Operational Constraints

🔧 Aging Infrastructure: Conventional treatment unable to handle extreme quality fluctuations

💸 High Maintenance Costs: Frequent chemical cleaning and system recovery required

🕒 Extended Downtime: Traditional solutions required days to recover after flood events

2000-NTU-Floodwater-Treatment2

Our Engineering Solution: Purpose-Built for Extreme Conditions

Prefabricated, Rapid-Deployment Design

📦 Zero Civil Works Required: Fully prefabricated plant deployed without construction

⏱️ Accelerated Timeline: Drastically shortened implementation schedule

🎯 Pre-Tested Performance: Factory-assembled and validated before shipment

Advanced Anti-Fouling Technology

🛡️ Specialized UF Membrane Modules: Engineered specifically for high-turbidity applications

🔄 Cross-Flow Filtration: Innovative flow pattern prevents membrane fouling

⚙️ Automated Backwashing: Intelligent cleaning maintains peak performance

2000-NTU-Floodwater-Treatment4

Measurable Outcomes: Setting New Industry Standards

Unmatched Operational Performance

💧 Consistent Water Quality: Product water turbidity stable at <0.1 NTU despite 2000 NTU influent

✅ Zero Process Failures: Complete elimination of flood-season shutdowns

🔄 Continuous Operation: 100% reliability during most challenging conditions

Dramatic Cost Reductions

💰 60% Lower Maintenance Costs: Eliminated restorative chemical cleaning requirements

⚡ Reduced Energy Consumption: Optimized cross-flow technology cuts power usage

👷 Minimal Staff Requirements: Automated operation reduces labor costs

National Recognition & Validation

🏆 Demonstration Site Status: Officially designated National Drinking Water Safety Demonstration Project

📊 Industry Benchmark: Now serving as reference standard for similar challenges nationwide

🌱 Sustainable Model: Replicable solution for high-turbidity regions globally

2000-NTU-Floodwater-Treatment5

Conclusion: Redefining Possible in Water Treatment

The Zhong County project demonstrates that even the most extreme raw water conditions can be reliably managed with targeted technology. Our prefabricated anti-fouling UF solution provides a rapidly deployable, cost-effective, and ultra-reliable blueprint for utilities facing high-turbidity challenges anywhere in the world.

[Strategic Call-to-Action]

Facing Extreme Turbidity or Seasonal Water Quality Challenges?
Our specialized anti-fouling UF systems are engineered to conquer the toughest conditions while reducing operational costs.
[Contact Our Extreme Water Solutions Team] for a customized assessment.